Pular para o conteúdo

MBI Files Federal Lawsuit Against Oregon Prevailing Wage Expansion. Read the press release here.

Mind the Gap: The Interface Between Onsite and Offsite Construction

Every design for manufacture and assembly (DfMA) project — modular, mass timber, or panelized — is really two projects joined at a seam. One is built in a controlled factory to millimeter tolerances; the other in the field, in weather, to the looser tolerances of poured concrete and human hands. Between them sits an interface: where the factory’s precision meets the site’s reality.

Leia mais

Modular by Design: Turning Architecture into a Manufacturing System

Modular construction is often presented as a faster way to build. Speed, however, is only one part of its value. The larger opportunity is to create a coordinated design and production system that improves quality, reduces uncertainty, and allows a building to move efficiently from concept design through manufacturing, transportation, installation, and completion.

Leia mais

Affordable Housing, One Module at a Time

module being craned into place

For builders and developers, modular factories offer significant scheduling and cost efficiencies compared with traditional site-built construction, regardless of whether the final product is workforce housing, single family homes, or apartment buildings.

Leia mais